\n
ENERGY STAR Portfolio Manager: Login. You have chosen to cancel. If you continue, all of the work you have performed will be lost. Are you sure you want to continue? Continue. Cancel.. This alert will flag any properties missing the required IT Meter.< /li> < li> < b> Gross Floor Area is 0 ft. If your bills run from mid- month to mid- month, you will need 1. You can associate meters from the Meters tab, click on . You can create one at the top of the Details tab.< /li> < /ul> Ambulatory Surgical Center. ![]() APS’ Energy Conservation Program. EPA Energy Star Portfolio Manager; Rain Barrel Garden Program; PNM Electricity Conservation Rebate Programs; Peak and Power Saver. The Portfolio Manager program is the entry point for documenting and managing the energy and water consumption within one building or across a portfolio of facilities. Ambulatory Surgery Centers refers to health care facilities that provide same- day surgical care, including diagnostic and preventive procedures.< br /> < br /> Gross Floor Area should include all space within the building(s) including offices, operating and recovery rooms, waiting rooms, employee break rooms and kitchens, elevator shafts, stairways, mechanical rooms, and storage areas. Amount of Laundry Processed Onsite Annually. The Amount of Laundry Processed Onsite Annually is the total quantity of laundry that is processed every year. Many pools have unique/nonstandard shapes. You should select the size that is closest to your pool. The concentration should be an average concentration, estimated over a 1. BOD is the measure of the amount of oxygen required by bacteria for stabilizing material that can be decomposed under aerobic conditions. BOD5 is a commonly used determinant of the organic strength of a waste, recording the oxygen demand over a five- day period. BOD5 should be reported in mg/l.< br /> < br /> BOD5 is < strong> < em> not the same as< /em> < /strong> CBOD5 (carbonaceous biological oxygen demand). BOD is the measure of the amount of oxygen required by bacteria for stabilizing material that can be decomposed under aerobic conditions. Energy Star Portfolio ProgramsBOD5 is a commonly used determinant of the organic strength of a waste, recording the oxygen demand over a five day period. BOD5 should be reported in mg/l.< br /> < br /> BOD5 is < strong> < em> not the same as< /em> < /strong> CBOD5 (the carbonaceous biological oxygen demand). To receive an ENERGY STAR score, you must report BOD5, not CBOD5, for your wastewater treatment plant.< br /> < br /> If your property is in the design phase, use your best estimate for the intended conditions when the property is fully operational. Average Number of Residents. The Average Number of Residents is the average number of residents that occupied the property for the previous 1. For example, if you have a 1. There is only one Occupancy rate for each property as a whole.< p> You enter your Occupancy when you first create the property, and you can change it on the Details tab. ![]() Why ENERGY STAR Portfolio Manager? The BOMA BEST program provides certification for buildings. The BOMA BEST refers to ENERGY STAR data and gives the owner the. Your Score is based on your specific Use Details (Number of Workers, Computers, etc). So, when you have changes to occupancy/vacancy in your property, you need to update your Use Details to accurately reflect the activity at your property.< p> The value you enter for occupancy < b> < i> could affect< /b> < /i> your eligibility for ENERGY STAR certification. We have the following minimum occupancy requirements: < ul> < li> Office/Bank/Courthouse/Financial Center . But, you may find it helpful to compare properties with different occupancy levels across your portfolio using custom reports.< p> Today, you enter a single occupancy rate, but you cannot track changes over time or see values from previous years. However, the ability to track values over time is on our . Avoided emissions may be either < strong> < em> onsite< /em> < /strong> or < strong> < em> offsite< /em> < /strong>. This is the avoided emissions effectively resulting from your onsite system.< /li> < li> < strong> Offsite Avoided Emissions< /strong> occur when you purchase green power from your utility or an independent supplier and you own the claims to the RECs. This is the avoided emissions effectively resulting from a green power purchase from your utility or independent supplier. Offsite Avoided Emissions also occur in the case of REC arbitrage, a transaction where you sell the RECs associated with your own onsite system and purchase other substitute RECs. In this case, the avoided emissions associated with your green power originate from offsite sources, not your onsite system.< /li> < /ul> < /li> < li> < strong> Net Emissions< /strong> - Net emissions are equal to your property\'s GHG emissions minus the Offsite Avoided Emissions. Energy Star Portfolio Program Manager![]() Energy Star (trademarked ENERGY STAR) is an international standard for energy efficient consumer products originated in the United States. It was created in 1992 by. Energy Star Portfolio Manager Currently selected. Energy Use Report; Evaluation of Non-Rated Building Types. Energy Program Donna K. Albert, PE, MCE, CEM, LEED-AP. Under standard GHG accounting protocol, your first step is always to compute your starting emissions inventory. This inventory will count electricity consumption from onsite systems as having zero emissions and will count electricity consumption of utility green power purchases as having the same emissions as non- green power (i. This inventory is your basic starting point. Then, you have a separate line item to account for your Offsite Avoided Emissions. The Offsite Avoided Emissions are subtracted from your basic inventory to yield your Net Emissions. Please note that you < em> < strong> do not subtract< /strong> < /em> the Onsite Avoided Emissions to get this net value, because they have already been counted as zero emissions in your starting inventory. You can select the pre- and post- periods you would like to compare. As a staring default Portfolio Manager will set these periods according to your date of completion. For example, if you have an project with a completion date of March 1. EUI for the 1. 2 months before the implementation date of your project (March 2. February 2. 01. 1) to the 1. April 2. 01. 1 to March 2. Please note that other energy projects and/or changes in operation may have occurred during this time. EPA does not attempt to estimate the effect of a single energy project controlling for all other changes. Child Property. See < a href=. This includes public and private colleges and universities.< br /> < br /> Gross Floor Area should include all space within the building(s), including classrooms, laboratories, offices, cafeterias, maintenance facilities, arts facilities, athletic facilities, residential areas, storage rooms, restrooms, elevator shafts, and stairways. Completely Enclosed Parking Garage Size. Completely Enclosed Parking Garage Size is the total area of a parking structure that is completely enclosed on all four sides and has a roof. Typically, such spaces are separated by walls and doors and have their own temperature and humidity control.< /li> < li> < strong> No< /strong> . Included in the letter is information regarding receipt of ENERGY STAR certification. Connected Contacts. Your . Connections are necessary to share your properties with others (either individuals or organizations); you need to be . To make a connection, go to the . Once you find them, send a . After they accept your connection request, they will show up on your list of connected contacts. Construction Status. Construction Status indicates whether your property is: < ul> < li> a design project< /li> < li> an existing operational property< /li> < li> a test property (one you are using for training or testing new features in Portfolio Manager) < /li> < /ul> You initially select your construction status when you create a property. You can change the construction status on the Details tab, under Basic Information. Contacts for ENERGY STAR Certification. The application for ENERGY STAR Certification includes several important contacts: < ul> < li> < strong> Application Primary Contact< /strong> is the person EPA will correspond with if there are any issues with the application. In most cases, this is the person who submits the application online.< /li> < li> < strong> Award Recipient< /strong> is the person to whom your ENERGY STAR congratulations letter and ENERGY STAR decal will be mailed.< /li> < li> < strong> Signatory< /strong> is the person in the organization, who will sign the final ENERGY STAR application in hard copy, along with the Licensed Professional. This person must be in your Contacts Book, but does not necessarily have to have a Portfolio Manager account.< /li> < li> < strong> Property Manager< /strong> is an outside organization that you have hired to manage your facility operations. If your property is managed internally by the property owner, this field will not be applicable. You should enter the same Currency Type for all of your properties to allow for comparison. As a future enhancement, Portfolio Manager may add a field to specify a Currency Type of either Canadian Dollars or US Dollars, on a property- by- property basis for all of its all financial indicators (e. Portfolio Manager does not convert between currencies. Current as of. You can edit the date if your . For example, if you change your weekly operating hours on June 1st of the same year your building was built, you would change . If you are sharing a property with multiple meters, you can even select different permissions for each meter. By default, all selections are set to . However, all metrics for the property are still accessible via Reporting. For example, if you want someone to add meter bills to your property, you would select . Typically these facilities require dedicated uninterruptible power supplies and cooling systems. When a data center is located within a larger building, it will usually have its own power and cooling systems, and require a constant power load of 7. W or more. It is computed as the total annual source energy divided by the annual IT source energy. A typical PUE value is about 2. Wh that is delivered to IT equipment, an additional k. Energy Star Portfolio Manager. EPA\'s Portfolio Manager is a free web- based tool used to track and report on building energy use. Benchmarking in Portfolio Manager identifies opportunities for energy savings in buildings occupied by state government, colleges, municipalities and schools. Albert, PE, MCE, CEM, LEED- APCell Phone: (3. E- mail: donna. albert@des. Department of Ecology. Hedia Adelsman. Hedia.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
April 2017
Categories |